Went to Ensenada with Don Ross and David Plotkin by car. Found the port stern line snapped off. Caused by the boat being tied too loose and the big surge. Hired Daniel/Coral Marine Services to do weekly checks on the Makai:
Line check
Run Engines and Genset
Check battery levels
Check bilge pumps
Purchased 1 35 and 1 25 ft ¾ in dock lines.. Had CMS replaced old dock lines and retie the boat.
Found Salon TV inoperable. David found a bad AC/DC converter which he will send to Mainship for warranty replacement.